Select Page

London

We are a main contractor undertaking all aspects of construction. Datum undertake projects in London varying in size from multi million-pound new build and refurbishments to smaller extension and renovation contracts.

Specialising in the following sectors:

Commercial

Commercial

29 Queen Anne St

Client: Property Management Business

Project : Refurbishing and altering a Grade II listed townhouse, enhancing the property’s functionality, safety, and overall aesthetic appeal whilst preserving its historical and architectural integrity.

The work involved, Installation of New M&E services. Replacement and repair of windows. Fire compartmentation work Restoring traditional lime plaster walls to maintain the building’s historical authenticity. Reconfiguring the internal layout to better suit modern needs while preserving key historical features. Damp proofing works. Restoring the brickwork to its original condition. WC and Tea point kitchen installations: Re-decoration and new finishes throughout.

 

 

Commercial

11-12 Wigmore Place

Client: Property Management Business

Project: Extensive external and internal remodelling to create a contemporary office space.   Contract included demolition and soft strip. External façade remodelling. New M&E Services throughout. Bespoke Joinery, Installation of flooring. Roof works to include lantern repairs and new rooflights. Repairs and alterations to existing staircase.

 

Commercial

Portland Place

Client: Property Management Business

Project: Refurbishment of 4th & 5th floors to include new stair access between floors.

Commercial

27 Baker Street

Client: Property Management Business

Project: Internal Office refurbishment, including strip out, new flooring, kitchens, shower rooms, partitioning and full MEP.

 

Residential

Residential

28 Park Crescent Mews West

Client: Residential new build for developer.

Project : Internal and External Refurbishment. Reconfiguration of the interior layout to better suit the needs of occupants. Replacement Mechanical, Electrical, and Public Health Service Installation to ensure the property is up-to-date and fully functional. Staircase modifications to update the interior to reflect a modern contemporary home. Installation of energy-efficient double glazed windows.

Residential

Ashland House

Client: Property Management Business

Project: Construction of mansard roof extension to accommodate penthouse apartment. Internal strip out. Alterations and refurbishment of 9 further apartments, complete fit out and finishings to include new M&E and joinery package througout.

 

Residential

34 Weymouth Street

Client: Property Management Business

Project: Internal minor demolition & strip out, Basement waterproofing. Internal alterations and refurbishment from multiple dwelling to single residential use. Complete fit out and finishing to include new M&E and PHS. Full joinery package to include bespoke fittings throughout.

 

Residential

44 Devonshire Street

Client: Property Management Business

Project: Internal strip out. Alterations and refurbishment of 5 flats and communal area, including restoration to entrance flooring and stained glass windows.

 

Residential

9 Devonshire Mews South

Client: Property Management Business

Project: Conversion of mews flat with garage below to a single residential house, in Harley Street conservation area. Contract included replacement roofing and exterior windows, creation of internal lightwell. Major internal layout alterations, new kitchen, bathrooms and M&E.

 

Medical

Medical

60 Wimpole Street

Client: Property Management Business

Project: Demolition and strip out of internal structure . Excavation of basement to include underpinning. Internal alternations and refurbishment to form medical use facility. New M&E and PHS including lift installation.

 

Retail

Retail

Evoke Showroom

Client: Evoke London W1G

Project: Working closely with the client and their design, this high end retail project was delivered within 12 weeks and 5% under budget. From strip out to final decoration Datum were involved from start to finish managing this project.

 

Design and Build

Design and Build

6 Grosvenor St

Client: Property Management Business

Project:

Cat A fit out to transform an existing first floor office space into a modern, efficient and visually appealing environment. 

Strip out of existing layout: Removing the current office layout to prepare for the new design. Reconfiguration: Adjusting the space to meet the new design requirements. Specialist glazing: Installing high-quality, specialized glass to enhance the office’s aesthetics and functionality. Bespoke joinery: Customizing woodwork to fit the new design and meet specific needs. Updates to M&E installation to ensure they are up-to-date and efficient. Setting up audio-visual equipment to support meetings, presentations, and other office activities. 

Let’s Build Something

We undertake all work including domestic and commercial developments, renovations, restorations and conversions. We have a team of skilled and experienced tradespeople to take care of all your building and maintenance needs.

info@datumccm.co.uk
The Vaults, 28 Castle Street, Hertford, SG14 1HH
01992 300678

5 + 8 =